semi合集-English.pdf - 第581页

SEMI E79-0304 © SEMI 1999, 2004 15 A2-1.5.1 Value-added In -Process OEE provides a measure of equipm ent productivity assuming the no n- value-added porti on of processing cycles is wast ed equipment time. The non-va lue…

100%1 / 7923
SEMI E79-0304 © SEMI 1999, 2004 14
Operations Time = 168 hours
Theoretical Production Time
for Effective Units = 146 hours
No Product Time = 6 hours
Equipment Unavailable No Product Time = 4 hours
Planned No Product Time = 8 hours
Recipe
Theoretical
Production Time
Per Unit (THT
i
)
Reference
Theoretical
Production Time
Per Unit (RTHT
i
)
Engineering
Theoretical
Production Time
Per Unit (ETHT
i
)
Value-Added In-Process
Theoretical
Production Time
Per Unit (VTHT
i
)
Actual
Units of
Recipe
Effective
Units of
Recipe
A 0.03333 hr/unit 0.03333 hr/unit 0.02500 hr/unit 0.01000 hr/unit 1500 1500
B 0.04000 hr/unit 0.03333 hr/unit 0.02000 hr/unit 0.00500 hr/unit 600 600
C 0.05000 hr/unit 0.03333 hr/unit 0.01500 hr/unit 0.00500 hr/unit 800 800
D 0.06667 hr/unit 0.03333 hr/unit 0.03250 hr/unit 0.01000 hr/unit 500 480
A2-1.3 Reference OEE (R-OEE)
A2-1.3.1 Reference OEE provides a measure of
equipment productivity relative to a benchmark
theoretical production time. The reference theoretical
production time per unit for a given recipe is the time
required by the benchmark equipment (i.e., the fastest
equipment model of similar type), running the
comparable recipe for a benchmark product and process
design. Reference theoretical production time per unit
(RTHT) shall be defined to be less than or equal to
theoretical time per unit (THT) used in calculating
standard OEE. The R-OEE
score may be compared
against the standard OEE score to assess the
productivity loss arising from the application of inferior
equipment.
Reference OEE (R-OEE)
=[
i
(Effective Units of Recipe i × RTHT
i
)]
/(Total Time)
where RTHT
i
= reference theoretical production time per unit
of recipe i (based on the benchmark equipment performing a
comparable recipe for a benchmark product and process
design). Reference OEE utilizes an incompatible definition of
theoretical production time for effective units compared to
that utilized in Engineering OEE and Value-Added In-Process
OEE. Productivity losses indicated by R-OEE and by E-OEE
and VA-OEE may overlap. (See Figure A2-1.)
A2-1.3.2 Sample Reference OEE (R-OEE) Calculation
Reference OEE (R-OEE)
= [
i
(Effective Units of Recipe i × RTHT
i
)]
/(Total Time)
= [(1500 units × 0.03333 hr/unit)
+ (600 units × 0.03333 hr/unit)
+ (800 units × 0.03333 hr/unit)
+ (480 units × 0.03333 hr/unit)]/(168.00 hours)
= 0.6706
A2-1.4 Engineering OEE (E-OEE)
A2-1.4.1 Engineering OEE provides a measure of
equipment productivity assuming process specifications
are optimized for minimum production time.
Engineering theoretical production time per unit
(ETHT) shall be defined to be less than or equal to
theoretical time per unit (THT) used in calculating
standard OEE. Engineering theoretical production time
per unit may include minimum durations for the
objective processing steps, e.g., implant time for ion
implant systems, and minimum allowances for any
additional supporting process steps, e.g., heating,
cooling, gas stabilization, only if those steps are
deemed absolutely necessary. Time to perform test
wafers, sample wafers, send-aheads, clean cycles,
seasoning cycles, and allowances for non-continuous
cascading of lots through tools are to be specifically
excluded.
Engineering OEE (E-OEE)
=[
i
(Effective Units of Recipe i × ETHT
i
)]
/(Total Time)
where ETHT
i
= engineering theoretical production time per
unit of recipe i.
A2-1.4.2 Sample Engineering OEE (E-OEE)
Calculation
Engineering OEE (E-OEE)
= [
i
(Effective Units of Recipe i × ETHT
i
)]
/(Total Time)
= [(1500 units × 0.02500 hr/unit)
+ (600 units × 0.02000 hr/unit)
+ (800 units × 0.01500 hr/unit)
+ (480 units × 0.03250 hr/unit)]/(168 hours)
= 0.4589
A2-1.5 Value-added In-Process OEE (VA-OEE)
SEMI E79-0304 © SEMI 1999, 2004 15
A2-1.5.1 Value-added In-Process OEE provides a
measure of equipment productivity assuming the non-
value-added portion of processing cycles is wasted
equipment time. The non-value-added time should be
the focus of efforts by the equipment supplier to reduce
or eliminate it through improved equipment design.
Value-added In-Process theoretical production time per
unit (VTHT) shall be defined to be less than or equal to
engineering theoretical production time per unit (ETHT)
used in calculating engineering E-OEE (OEE).
Value-Added In-Process OEE (VA-OEE)
= [
i
(Effective Units of Recipe i × VTHT
i
)]
/(Total Time)
where VTHT
i
= value-added in-process theoretical production
time per unit of recipe i.
A2-1.5.2 Value-added in-process theoretical
production time per unit credits time only for the
objective processing steps. The objective processing
steps for recipes performed by major types of wafer
fabrication equipment are indicated in Table A2-1.
A2-1.5.3 Value-added in-process theoretical
production time per unit specifically excludes the
following items (partial list):
All wafer handling time,
All load-lock time,
Pre-etch and pre-deposition time,
Thermal stabilization time,
Gas stabilization time,
Wafer heating and cooling time,
Time for clean cycles, and
High-etch and seasoning time.
A2-1.5.4 Sample Value-Added In-Process OEE (VA-
OEE) Calculation
Value-added In-Process OEE (VA-OEE)
= [
i
(Effective Units of Recipe i × VTHT
i
)]
/(Total Time)
= [(1500 units × 0.01000 hr/unit)
+ (600 units × 0.00500 hr/unit)
+ (800 units × 0.01000 hr/unit)
+ (480 units × 0.0050 hr/unit)]/(168 hours)
= 0.1690
Table A2-1 Identification of Objective Process Steps for Value-Added In-Process Theoretical Time Per Unit
Equipment Type VTHT
i
Includes VTHT
i
Excludes
Resist Processing Coat, Develop, Bake, Cool Time at
Process Temperature
Temp. Ramp Up/Down
Photolithography Exposure Exposure Time Pre-Alignment, Align, Stepping Time
Etch, Oxide, Metal, Poly Flood Expose Time Chamber Clean Time
Asher, Dry Ashing Time
Clean Wet Processing Station Acid, Rinse and Dry Time Robot Transport Time
Furnace Atmospheric Process,
Furnace LPCVD Process, and
Rapid Thermal Processing
Main Oxidation, Anneal Time at
Defined Fixed Process Temperatures
Resulting in Thermal (Film) Treatment
Ramp Up/Down, Boat Push/Pull
Implanter HC, MC, HE … Implant Time Beam Setup Time
Metal Deposition - PVD, CVD Metal Deposition Time Chambers Clean Time
Dielectric - CVD Dielectric Deposition Time Chambers Clean Time
CMP Planarization Polishing Time Pad Dressing Dedicated Time
Measure CD SEM Measurement Time Pattern Recognition Time
Measure Overlay Measurement Time Pattern Recognition Time
Defect Detection Patterned Wafers Scanning Measurement Time Pattern Recognition Time
Defect Detection Unpatterned Wafers Scanning Measurement Time
Measure Film Thickness Measurement Time Pattern Recognition Time
SEMI E79-0304 © SEMI 1999, 2004 16
A2-2 Additional Productivity Metrics Involving
Denominators Other Than Total Time
A2-2.1 This section presents three productivity metrics
for assessing efficiency of the equipment resource
relative to a time frame less than total time.
A2-2.2 Production Equipment Efficiency and Demand
Equipment Efficiency exclude portions of no product
time from productivity losses, as depicted in Figure A2-
2. While the idle time due to no product is excluded
from the operational losses in these particular measures
of equipment efficiency, the user should be aware that
the additional productivity losses due to sub-optimal
load or batch sizes may also be present as rate
efficiency losses. Such losses, which result from
fluctuations in product flow or tool loading policies, are
considered in any equipment efficiency calculation that
uses theoretical time per unit.
A2-2.3 Production Equipment Efficiency (PEE)
A
measure of equipment productivity during the time that
work is available to process at the tool. One application
of PEE is to measure the productivity of non-constraint
tools, which are expected to have periods of idle time
due to lack of available work.
Production Equipment Efficiency (PEE)
= (Theoretical Production Time for Effective Units)
/[(Operations Time) - (No Product Time)
- (Equipment Down No Product Time)]
= Overall Equipment Efficiency × Total Time
/[(Operations Time) - (No Product Time)
- (Equipment DownNo Product Time)]
A2-2.3.1 Sample Production Equipment Efficiency
(PEE) Calculation
Production Equipment Efficiency (PEE)
= (146 hours)/[(168 hours) - (6 hours) - (4 hours)]
= 0.9241
A2-2.4 Demand Equipment Efficiency (DEE) A
measure of equipment productivity during the time that
work is planned to be available to process at the
equipment. A factory model or production schedule
that defines the expected or planned idle time at the
equipment is required to calculate Demand Equipment
Efficiency. DEE measures the productivity of the
equipment relative to the requirements of the factory
model or production schedule.
Demand Equipment Efficiency (DEE)
= (Theoretical Production Time for Effective Units)
/[(Operations Time) - (Planned No Product Time)]
= Overall Equipment Efficiency × Total Time
/[(Operations Time) - (Planned No Product Time)]
A2-2.4.1 Sample Demand Equipment Efficiency (DEE)
Calculation
Demand Equipment Efficiency (DEE)
= (146 hours)/[(168 hours) - (8 hours)]
= 0.9125
A2-2.5 Intrinsic Equipment Efficiency (IEE)
A
measure of equipment productivity that compares
value-added, in-process theoretical production time to
the actual production time. IEE measures the combined
productivity losses due to rate efficiency losses, recipe
design, and equipment design.
Intrinsic Equipment Efficiency (IEE)
= [
i
(Actual Units of Recipe i × VTHT
i
)]
/(Production Time)
where VTHT
i
= value-added in-process theoretical production
time per unit for recipe i. See Section A2-1.3.
A2-2.5.1 Sample Intrinsic Equipment Efficiency (IEE)
Calculation
Production Time = 155.00 hours
Intrinsic Equipment Efficiency (IEE)
= [
i
(Actual Units of Recipe i × VTHT
i
)]
/(Production Time)
= [(1500 units × 0.01000 hr/unit)
+ (600 units × 0.00500 hr/unit)
+ (800 units × 0.01000 hr/unit)
+ (500 units × 0.0050 hr/unit)]/(155 hours)
= 0.1839