SEMI E6-0303 © SEMI 1982, 2003 1 SEMI E6-0303 GUIDE FOR SEMICONDUCTOR EQUIPMENT INSTALLATION DOCUMENTATION This guide was technically approved b y the Global Fa cilites Committee and is the direct responsibility of the N…

100%1 / 7923
SEMI E2.5-93 © SEMI 1993, 2003 2
NOTICE: These standards do not purport to address safety issues, if any, associated with their use. It is the
responsibility of the user of these standards to establish appropriate safety and health practices and determine the
applicability of regulatory limitations prior to use. SEMI makes no warranties or representations as to the suitability
of the standards set forth herein for any particular application. The determination of the suitability of the standard is
solely the responsibility of the user. Users are cautioned to refer to manufacturer's instructions, product labels,
product data sheets, and other relevant literature respecting any materials mentioned herein. These standards are
subject to change without notice.
The user's attention is called to the possibility that compliance with this standard may require use of copyrighted
material or of an invention covered by patent rights. By publication of this standard, SEMI takes no position
respecting the validity of any patent rights or copyrights asserted in connection with any item mentioned in this
standard. Users of this standard are expressly advised that determination of any such patent rights or copyrights, and
the risk of infringement of such rights, are entirely their own responsibility.
Copyright by SEMI® (Semiconductor Equipment and Materials
International), 3081 Zanker Road, San Jose, CA 95134. Reproduction o
f
the contents in whole or in part is forbidden without express written
consent of SEMI.
SEMI E6-0303 © SEMI 1982, 2003 1
SEMI E6-0303
GUIDE FOR SEMICONDUCTOR EQUIPMENT INSTALLATION
DOCUMENTATION
This guide was technically approved by the Global Facilites Committee and is the direct responsibility of the
North American Facilities Committee. Current edition approved by the North American Regional Standards
Committee on November 22, 2002. Initially available at www.semi.org January 2003; to be published March
2003. Originally published in 1982; previously published December 1996.
NOTICE: This document was balloted as a complete
rewrite of SEMI E6 in 2002.
1 Purpose
1.1 Within the semiconductor industry, the diversity
and complexity of equipment creates difficult
challenges for facilities design and equipment
installation. This guide should benefit equipment
suppliers and semiconductor manufacturers by
communicating, in a standardized way, the information
necessary to prepare the facility and to efficiently install
semiconductor equipment.
2 Scope
2.1 This standard applies to the facilities interface of
all semiconductor production equipment and supplier-
provided support equipment.
2.2 The recommended equipment installation
documentation should cover all installation
requirements from receiving until hookup is complete.
2.3 The series of data sheets included should address
all site facilities necessary to support semiconductor
equipment processing.
2.4 The data sheets provide a consistent format for
both the equipment supplier and equipment purchaser
to use in compiling and interpreting equipment
installation data.
NOTICE: This standard does not purport to address
safety issues, if any, associated with its use. It is the
responsibility of the users of this standard to establish
appropriate safety and health practices and determine
the applicability of regulatory or other limitations prior
to use.
3 Limitations
3.1 SEMI E6 applies to the facility interface of
semiconductor equipment only. Other equipment
interfaces, such as the physical interfaces for material
handling (see SEMI E106 and related standards) and
software interfaces (see SEMI Information and Control
Standards) are defined by other SEMI Standards.
3.2 This guide is not intended to address the internal
connections of the equipment that are typically
completed by the equipment supplier. This document
includes only information related to the utility
connections on the equipment or support equipment
that are the responsibility of the semiconductor
manufacturer’s equipment installation team.
3.3 This guide is not intended to address the
documentation provided for equipment start-up,
qualification, or commissioning.
4 Referenced Standards
4.1 SEMI Standards
SEMI E30 — Generic Model for Communications and
Control of Manufacturing Equipment (GEM)
SEMI E52 — Practice for Referencing Gases Used in
Digital Mass Flow Controllers
SEMI E63 — Mechanical Specification for 300 mm
Box Opener/Loader to Tool Standard (BOLTS-M)
Interface
SEMI E70 — Guide for Tool Accommodation Process
SEMI E72 — Specification and Guide for 300 mm
Equipment Footprint, Height, and Weight
SEMI E73 — Specification for Vacuum Pump
Interfaces - Dry Pumps
SEMI E74 — Specification for Vacuum Pump
Interfaces - Turbomolecular Pumps
SEMI E76 — Guide for 300 mm Process Equipment
Points of Connection to Facility Services
SEMI E106 — Provisional Overview Guide to SEMI
Standards for Physical Interfaces and Carriers for 300
mm Wafers
NOTICE: Unless otherwise indicated, all documents
cited shall be the latest published versions.
SEMI E6-0303 © SEMI 1982, 2003 2
5 Terminology
NOTE 1: A complete list of equipment installation
terminology can be found in SEMI E70.
5.1 Definitions
5.1.1 idle — the condition where the equipment is
energized and readied for processing (all systems ready
and temperatures controlled) but is not actually
performing any active function such as material
movement or processing.
5.1.1.1 idle average flow — the average flow rate
when the equipment is in idle condition. Idle average
flow should be measured at the equipment point of
connection.
5.1.2 maximum pressure — the highest supply pressure
that can be used for the equipment to operate correctly.
Maximum pressure should be measured at the
equipment point of connection and may be driven by
process requirements or component limits.
5.1.3 maximum pressure fluctuation — the maximum
supply pressure change during the processing cycle for
the equipment to operate correctly.
5.1.4 minimum pressure — the minimum supply
pressure that must be maintained or exceeded for the
equipment to operate correctly. Minimum pressure
should be measured at the equipment point of
connection.
5.1.5 processing cycle — a sequence wherein all of the
material contained in a processing unit is processed.
This is often used as a measure of action or time [SEMI
E30]. (See Figure 1.)
5.1.5.1 process average flow — the average flow rate
over the processing cycle. Process average flow should
be measured at the equipment point of connection.
6 Ordering and Use
6.1 Semiconductor manufacturers may use this
standard when procuring semiconductor equipment to
specify type and format of facility interface information
to be provided by equipment supplier.
6.2 Orders for semiconductor equipment in accordance
with this standard should include the standard number
and date of issue. The request should also include
documentation due date, the data transmission method,
file format for data, file format for drawings, and any
additional information to be included that is not covered
in SEMI E6.
6.3 Roles and Responsibilities The equipment
supplier submits information requested in SEMI E6.
Unless otherwise specified, equipment suppliers should
submit the utilities and installation information prior to
the equipment ship date. The semiconductor
manufacturer’s equipment engineers, facilities
engineers, and installation managers use equipment
information provided to prepare the facility and
efficiently install the tool.
7 Installation Documentation
Recommendations
7.1 Consider every step from receiving until hookup is
complete. All requirements should be indicated. The
following is a list of recommended equipment
installation documentation to be provided by the
equipment supplier.
7.1.1 Administrative Interface Information — The
administrative interface information should include an
installation contacts sheet naming all relevant supplier
and purchaser contacts for commercial and technical
questions. Also included should be installation roles
and responsibilities for the supplier and purchaser. (See
Related Information 1 at the end of this document.)
7.1.2 Shipping and Receiving Information
Documentation should include information such as
container inventory, storage, and unpacking
instructions. Suppliers should include information about
the size, weight, type and number of containers in
which this equipment is shipped. Include detailed lists
of all supplied components and parts. How the
containers are to be received, handled and stored should
be documented. Any special staging, inspection, and
uncrating instructions should be provided. If containers
cannot be unloaded by hand the necessary equipment
should be listed. (See Related Information 2.)
7.1.3 Move-in, Placement, and Assembly Instructions
— Documentation should include information such as
moving, positioning, wall mounting, leveling,
alignment, floor loading, floor mounting, pedestal
mounting, and seismic restraint of equipment. Detailed
instructions should be provided for all assembly and
hookup steps required to make the equipment
functional. List any necessary parts, resources and
special equipment to be provided by the purchaser. (See
Related Information 3.)
7.1.4 Installation ESH Information — Document any
concerns relating to environmental, safety, and health
aspects of installation of the equipment (see related
SEMI Safety Guidelines).
7.1.5 Data Sheets and Drawings — Recommended
data sheets are defined in the following sections of this
document. Equipment suppliers should reference and
provide all necessary equipment drawings and
schematics with these data sheets. (See Sections 9
through 19.)