SEMI E76-0299
SEMI 1998, 1999
1
SEMI E76-0299
GUIDE FOR 300 mm PROCESS EQUIPMENT POINTS OF
CONNECTION TO FACILITY SERVICES
This Guide was technically approved by the Global Facilities Committee and is the direct responsibility of
the North American Facilities Committee. Current edition approved by the North American Regional
Standards Committee on August 15, 1998. Initially available at www.semi.org January 1999; to be published
February 1999. Originally published September 1998.
This document replaces E76-0998 in its entirety.
1 Purpose
1.1 Factory design variations make it difficult for
equipment manufacturers to predict or agree on
consistent points of connection for hookup of equipment
to facility services. Similarly, device manufacturers
cannot easily pre-facilitate their factories for equipment
because the connections on the equipment are not
consistently located. Standardization of connection
locations and utilizing pre-facilitation strategies
decreases the cost of and time required for equipment
installation.
1.2 This document is a guide for 300 mm equipment
manufacturers to define the positioning of the
equipment points of connection (EPOC), required on
semiconductor processing equipment for hookup to
facility utility services. The document identifies
locations for the EPOC’s and provides EPOC
consistency recommendations that should allow for
efficient equipment installation. In addition, this
document defines strategies to support the device
manufacturer’s ability to pre-facilitate the utility point
of connection (UPOC). Recommendations for supplier-
provided EPOC documentation are also included.
2 Scope
2.1 This guide addresses three areas that are necessary
to improve the efficiency of and reduce the duration of
equipment installations.
a) Recommendations for EPOC location, grouping,
consistency and reduction to increase confidence in
the accuracy and repeatability of EPOC’s, and
reduce the amount of work required to hookup
equipment. As a result, device manufacturers can
employ standard pre-facilitation strategies and
increase the efficiency of equipment installation.
b) Pre-facilitation recommendations that provide the
ability for UPOC’s to be efficiently and accurately
installed prior to equipment delivery, thus allowing
immediate hook-up of the equipment upon arrival
in the wafer fab. This includes recommendations
for jigs, templates, mating pedestal bases, and
associated interface panels.
c) Documentation recommendations to be required by
the device manufacturer and provided by the
equipment supplier relative to EPOC location,
group, consistency, pre-facilitation strategies and
hardware. This includes additional documentation
recommended to support equipment installations
but not directly related to EPOC’s.
2.2 This guide applies to 300 mm semiconductor
processing equipment and any supplier-provided
support equipment for installation into new factories.
2.3 The following groups of utilities are covered in this
guide.
Electrical Power
Data communications
Exhaust and other process effluents
Process fluids (liquids and gases)
Support equipment interconnects
2.4 The primary focus for this guide is hookup of
semiconductor processing equipment including but not
limited to the following equipment types.
Etch equipment (Dry and Wet)
Film deposition equipment (CVD, PVD and
Plating)
Thermal equipment
Surface prep and clean
Photolithography equipment (Stepper and
Tracks)
Chemical Mechanical Polishing equipment
Ion Implant equipment
Metrology equipment
3 Limitations
3.1 This standard does not apply to assembly and test
equipment.
3.2 International, national, and local codes, regulations
SEMI E76-0299
SEMI 1998, 1999
2
and laws should be consulted to ensure that the
equipment meets regulatory requirements in each
location.
3.3 This guide is not intended to address design issues
related to safety. Safety issues are addressed in other
SEMI standards (See SEMI S2).
4 Referenced Documents
4.1 SEMI documents
SEMI E6 — Facilities Interface Specifications
Guideline and Format
SEMI S2 — Safety Guideline for Semiconductor
Manufacturing Equipment
NOTE: All documents cited will be the latest published
versions.
5 Terminology
5.1 bottom feed — Equipment utility supply lines enter
the equipment from its underside typically through the
floor.
5.2 equipment configuration — Specifically, the
arrangement, location, type and quantity of EPOC’s
needed for installation. Also know as tool configuration.
5.3 equipment point of connection (EPOC) — A
fitting or other terminal provided with the processing
equipment (either external or internal) for utility
connection, the equipment end/termination of the
hookup. Also know as tool point of connection.
5.4 external connection — An external connection is
located outside the main frame of equipment.
5.5 facilities interface specification
— Documentation
provided by an equipment supplier that contains the
equipment requirements for utilities and installation
[SEMI E6].
5.6 facility services — Any gas, exhaust, liquid,
power, data communications or other material which are
supplied to or carried away from the equipment and
used in the process. Also referred to as utilities or
facilities.
5.7 footprint — The total area or floor space
consumed by a piece of equipment when viewed
perpendicular to the area of reference (e.g., normally,
when viewed from directly overhead and considering
the floor).
5.8 hazardous production materials (HPM) — A
solid, liquid, or gas that has a degree of hazard rating in
health, flammability, or reactivity of class 3 or 4 as
ranked by NFPA 704 and that is used directly in
research, laboratory, or production processes that have
as their end product materials that are not hazardous.
5.9 hookup — The set of activities and organization
required to accept incoming process equipment, move it
into place, connect the equipment to all facilities, and
test the connections. The connection of all necessary
facilities and interconnects required to make the
equipment package fully operational.
5.10 interconnect — Connections between equipment
mainframe and peripheral equipment subsystem
equipment [SEMI E6].
5.11 internal connection — An internal connection is
a utility connection to the equipment which is located
internal to the equipment and typically associated with
hazardous utilities.
5.12 interface box — An enclosure located between
the equipment mainframe and facility services typically
containing components for pressure regulation and
filtration. It functions to consolidate facility service
requirements to single points of connection. The
interface box can provide location and ability to pre-
facilitate equipment hookups in advance of equipment
delivery.
5.13 jig — A three dimensional fixture, typically a
frame that contains equipment installation aides which
serve to indicate location and type of connection needed
for equipment hook-up.
5.14 location plane — The common area on a piece of
equipment where EPOC’s may be located (e.g., back,
side, top, bottom).
5.15 pedestal Structural support element upon
which equipment or raised floor rests.
5.16 pre-facilitation — The stage in the equipment
installation process that follows base build and precedes
equipment delivery/equipment hookup. Pre-facilitation
brings the various facilities services close to the new
equipment location, including new facilities services
and structural modifications required to prepare the
facility to accept the equipment.
5.17 pre-facilitation pedestal — A matching
equipment floor mounting surface intended to act as a
means to expedite equipment hookup, as well as, save
fab floor space by having pre-plumbed connections.
Ideally, the pedestal would be installed and facilitated to
the UPOC’s prior to the equipment arrival.
5.18 raised floorThe removable floor system
installed above the actual building floor within
cleanroom environments to control air flow and allow
access for utility routing and connection.
SEMI E76-0299
SEMI 1998, 1999
3
5.19 seismic bracing — Structural reinforcement to
minimize damage due to earthquakes.
5.20 single line drop — A hookup strategy where a
piece of processing equipment has only one point of
connection per facility service. All manifolding for an
individual service is handled with in the equipment.
5.21 specialty gas — Non-bulk process gases typically
stored in cylinders and used to supply one or more
process equipment through specialized manifolds.
5.22 subfab — The area below or outside of the
cleanroom production area that can be a single or
multiple levels and may or may not be clean.
5.23 support equipment — Ancillary equipment not
part of the main chassis.
5.24 template — Provides a dimensional outline of the
equipment footprint including overall dimensions,
equipment datum point, utility connection/penetration
locations, equipment interconnect/penetration locations,
maintenance and access spaces, and wafer load/unload
stations. It can be made from any cleanroom compatible
material.
5.25 tool — Any piece of semiconductor fabrication or
inspection equipment designed to process wafers. Often
used synonymously with equipment in the silicon wafer
processing industry.
5.26 tool accommodation — A methodology by which
semiconductor processing equipment is installed in a
cost-effective and timely manner.
5.27 top feed — Where utility supply lines enter the
equipment from the topside.
5.28 utility point of connection (UPOC) The mating
fitting or terminal provided by the facility for
interconnection with the EPOC for utility supply, the
facility end/termination of the hookup at the equipment.
Table 1. Equipment Point of Connection Location Recommendations
Facility Service / Utility
Bottom Location Plane
Preference
Back Location Plane
Alternate
Gas, Bulk Bottom Back (lower)
Gas, Specialty Bottom Back (lower) Back
Exhaust, Corrosive Bottom Back (lower) Back
Exhaust, Flammable Bottom Back (lower) Back
Exhaust, Solvent Bottom Back (lower) Back
Exhaust, General Bottom Back (lower) Back
Chemical Supply, Inorganic Bottom Back (lower)
Chemical Supply, Organic Bottom Back (lower)
Ultrapure Water Bottom Back (lower)
Cooling Water Bottom Back (lower)
Hot Ultrapure Water Bottom Back (lower)
Drain, Inorganic Bottom Bottom Back (lower)
Drain, Waste Chemical, Organic Bottom Bottom Back (lower)
Power, 100V Bottom Back (above wet EPOC)
Power, 200/400V Bottom Back (above wet EPOC)
Fire Suppression Bottom Back
Ancillary Component Interconnect Bottom Back (above wet EPOC)
Signal Cable Bottom Back (above wet EPOC)
Vacuum Foreline Bottom Bottom Back
Process Vacuum Bottom Back
NOTE: Connections located on the top are not recommended because of possible interference with overhead wafer
handling and minienvironment equipment.