semi合集-English.pdf - 第520页

SEMI E74-0301 © SEMI 1998 , 2001 9 RELATED INFORM A TI ON 1 AP P L I C AT I O N N OT E S NOT E: T his re lated inform ation is n ot a n offic ial part of SEMI E 74 and is n ot intended t o modify or superc ede the of fic…

100%1 / 7923
SEMI E74-0301 © SEMI 1998, 2001 8
6.3 Incoming Power Supply
6.3.1 Table 8 and Table 9 specify the required TMP incoming AC power supply connector and pin assignments.
Table 8 Incoming AC Power Supply Connector (pump side)
No. Items Connector Type Referenced Standard Pin Assignments Remarks
1 Single phase,
200V
AC
230V
AC
± 10%
50/60 Hz
Receptacle (male) SEMI S2 See Table 9
Table 9 Pin Assignment for Incoming Power Supply Connector
No. Pin No. Item Remarks
1 1 or A Hot AC
2 2 or B Cold single phase
3maximum or last
pin number in the
connector
Earth/Ground When using a connector that has a special grounding pin
not included in the standard pin arrangement, the last pin
becomes a blank pin. (See Related Documents for an
example of specification for this connector.)
7 Related Documents
NOTE 2: All documents cited will be the latest published versions.
7.1 DIN Standard
2
DIN VDE 0627 — Connectors and plug-and-socket devices; for rated voltages to 1000 V
AC
, up to 1200 V
DC
, and
rated currents up to 500 A for each pole
7.2 Military Standard
3
MIL-PRF-24308 — General Specification for Connectors, Electric, Rectangular, Non-Environmental, Miniature,
Polarized Shell, Rack, and Panel
NOTICE: SEMI makes no warranties or representations as to the suitability of the standards set forth herein for any
particular application. The determination of the suitability of the standard is solely the responsibility of the user.
Users are cautioned to refer to manufacturer’s instructions, product labels, product data sheets, and other relevant
literature respecting any materials mentioned herein. These standards are subject to change without notice.
The user’s attention is called to the possibility that compliance with this standard may require use of copyrighted
material or of an invention covered by patent rights. By publication of this standard, SEMI takes no position
respecting the validity of any patent rights or copyrights asserted in connection with any item mentioned in this
standard. Users of this standard are expressly advised that determination of any such patent rights or copyrights, and
the risk of infringement of such rights, are entirely their own responsibility.
2 Deutsches Institut für Normung e.V., Beuth Verlag GmbH Burggrafenstrasse 4-10, D-10787 Berlin, Germany
3 Military Standards, Naval Publication and Form Center, 5801 Tabor Avenue, Philadelphia, PA 19120
SEMI E74-0301 © SEMI 1998, 20019
RELATED INFORMATION 1
APPLICATION NOTES
NOTE: This related information is not an official part of SEMI E74 and is not intended to modify or supercede the official
standard. This related information is optional and contains information that is not required to conform to this standard.
NOTE 1: While this standard was developed to specify
vacuum pumps installed with 300 mm equipment, the
standard should also be applied to vacuum pumps
installed with 200 mm equipment.
NOTE 2: ICF flange is available on request for inlet
flange.
NOTE 3: In order to save space and reduce cost, the
connector for the control and running status signals
should be a minimum size required for the number of
pins specified in the standard. If the additional signal
connections are required another connector should be
added to the pump.
NOTICE: SEMI makes no warranties or
representations as to the suitability of the standards set
forth herein for any particular application. The
determination of the suitability of the standard is solely
the responsibility of the user. Users are cautioned to
refer to manufacturer’s instructions, product labels,
product data sheets, and other relevant literature
respecting any materials mentioned herein. These
standards are subject to change without notice.
The user’s attention is called to the possibility that
compliance with this standard may require use of
copyrighted material or of an invention covered by
patent rights. By publication of this standard, SEMI
takes no position respecting the validity of any patent
rights or copyrights asserted in connection with any
item mentioned in this standard. Users of this standard
are expressly advised that determination of any such
patent rights or copyrights, and the risk of infringement
of such rights, are entirely their own responsibility.
Copyright by SEMI® (Semiconductor Equipment and Materials
International), 3081 Zanker Road, San Jose, CA 95134. Reproduction o
f
the contents in whole or in part is forbidden without express written
consent of SEMI.
SEMI E76-0299
SEMI 1998, 1999
1
SEMI E76-0299
GUIDE FOR 300 mm PROCESS EQUIPMENT POINTS OF
CONNECTION TO FACILITY SERVICES
This Guide was technically approved by the Global Facilities Committee and is the direct responsibility of
the North American Facilities Committee. Current edition approved by the North American Regional
Standards Committee on August 15, 1998. Initially available at www.semi.org January 1999; to be published
February 1999. Originally published September 1998.
This document replaces E76-0998 in its entirety.
1 Purpose
1.1 Factory design variations make it difficult for
equipment manufacturers to predict or agree on
consistent points of connection for hookup of equipment
to facility services. Similarly, device manufacturers
cannot easily pre-facilitate their factories for equipment
because the connections on the equipment are not
consistently located. Standardization of connection
locations and utilizing pre-facilitation strategies
decreases the cost of and time required for equipment
installation.
1.2 This document is a guide for 300 mm equipment
manufacturers to define the positioning of the
equipment points of connection (EPOC), required on
semiconductor processing equipment for hookup to
facility utility services. The document identifies
locations for the EPOC’s and provides EPOC
consistency recommendations that should allow for
efficient equipment installation. In addition, this
document defines strategies to support the device
manufacturer’s ability to pre-facilitate the utility point
of connection (UPOC). Recommendations for supplier-
provided EPOC documentation are also included.
2 Scope
2.1 This guide addresses three areas that are necessary
to improve the efficiency of and reduce the duration of
equipment installations.
a) Recommendations for EPOC location, grouping,
consistency and reduction to increase confidence in
the accuracy and repeatability of EPOC’s, and
reduce the amount of work required to hookup
equipment. As a result, device manufacturers can
employ standard pre-facilitation strategies and
increase the efficiency of equipment installation.
b) Pre-facilitation recommendations that provide the
ability for UPOC’s to be efficiently and accurately
installed prior to equipment delivery, thus allowing
immediate hook-up of the equipment upon arrival
in the wafer fab. This includes recommendations
for jigs, templates, mating pedestal bases, and
associated interface panels.
c) Documentation recommendations to be required by
the device manufacturer and provided by the
equipment supplier relative to EPOC location,
group, consistency, pre-facilitation strategies and
hardware. This includes additional documentation
recommended to support equipment installations
but not directly related to EPOC’s.
2.2 This guide applies to 300 mm semiconductor
processing equipment and any supplier-provided
support equipment for installation into new factories.
2.3 The following groups of utilities are covered in this
guide.
Electrical Power
Data communications
Exhaust and other process effluents
Process fluids (liquids and gases)
Support equipment interconnects
2.4 The primary focus for this guide is hookup of
semiconductor processing equipment including but not
limited to the following equipment types.
Etch equipment (Dry and Wet)
Film deposition equipment (CVD, PVD and
Plating)
Thermal equipment
Surface prep and clean
Photolithography equipment (Stepper and
Tracks)
Chemical Mechanical Polishing equipment
Ion Implant equipment
Metrology equipment
3 Limitations
3.1 This standard does not apply to assembly and test
equipment.
3.2 International, national, and local codes, regulations