SEMI E83-1000 © SEMI 1999 , 2000 4 resp ecting a ny mater ials ment ioned herei n. T hese standards are s ubject to change without notice. The user’s attention is called to the possib ility that compliance w it h this st…

SEMI E83-1000 © SEMI 1999, 20003
RELATED INFORMATION 1
APPLICATION NOTES
NOTE: This related information is not an official part of SEMI E83, but was approved for publication by full letter ballot
procedures on July 14, 2000.
R1-1 The intent of this standard is to provide manually
guided 300mm carrier transport PGVs a standard flange
for docking and to facilitate a safe, quick, and
repeatable PGV to load port carrier transfer method or
mechanism. Standardization of features on the flange is
intended to allow for interoperability between PGV
designs and the docking flange.
R1-2 SEMI E64 defines Zone L as an exclusion zone
in SEMI E15.1 compliant tools. It is intended that the
docking flange be mounted in this zone.
R1-3 The docking interface flange includes features to
allow for the following minimum functionality of the
PGV to flange docking procedure:
• Stopping PGV motion
• Guidance of PGV to flange
• x, y & theta alignment of the PGV to the flange
• Locking of PGV to flange
• Docking parallel or perpendicular to the flange
R1-4 The PGV side of the interface may include
additional features to allow for all or some of the
following functionality:
• Compliance to the docking flange
• To dampen impact of docking forces
R1-5 No features on the standard docking flange
provide an adjustable feature to indicate the height
(dimension as H defined by SEMI E15.1) the load port
horizontal datum plane has been adjusted to.
R1-6 It is likely that the alignment error and tolerance
stack up between the docking interface flange and the
equipment load port will not provide sufficient
accuracy alone for accurate pick/placement of a pod
onto the kinematic couplings on the load port.
R1-7 Possible sources of alignment error are:
• Cleanroom floor height and level
• PGV wheels and framework
• Installation accuracy of docking interface flange
• Stability of mounting
R1-8 It may be necessary to use additional alignment
methods to improve accuracy of pod placement onto the
kinematic couplings.
R1-9 It is expected that the interface device be floor
mounted. Thus, the equipment must not require the use
of support pedestals or other support structures under
the floor below Zone L.
R1-10 The docking flange should sustain docking
impact for the lifetime of the flange without any
performance degradation.
• Assume 90kg (200lb) PGV moving at 0.3m/s
(1ft/sec)
• Assume 250,000 docking cycles within a flange
lifetime
• Recommended to design for 3x safety factor for
single docking cycle
R1-11 Flange must be quick remove, replace, align and
calibrate.
R1-12 Surface B' (shown on Figure 2) allows docking
mechanism designs to grab onto the docking flange
without using the docking pin for support.
R1-13 The method of attaching the vertical pin to the
flange is not defined in this standard. Docking flange
designers should be aware of the docking forces
incurred on this pin and design the attachment method
accordingly.
R1-14 The method of attaching the flange to the floor
is not defined in this standard. Docking flange
designers should be aware of the docking forces
incurred on the flange and/or pin and design the
attachment method accordingly.
R1-15 This standard specifies the radii of certain edges
found on the docking flange. It is recommended that
edges that do not have a specified radius are radiused or
broken to eliminate sharp edges.
R1-16 It is left to user to define the needed flange
length (w2×2) at the time of placing an order.
NOTICE:. SEMI makes no warranties or
representations as to the suitability of the standards set
forth herein for any particular application. The
determination of the suitability of the standard is solely
the responsibility of the user. Users are cautioned to
refer to manufacturer’s instructions, product labels,
product data sheets, and other relevant literature

SEMI E83-1000 © SEMI 1999, 2000 4
respecting any materials mentioned herein. These
standards are subject to change without notice.
The user’s attention is called to the possibility that
compliance with this standard may require use of
copyrighted material or of an invention covered by
patent rights. By publication of this standard, SEMI
takes no position respecting the validity of any patent
rights or copyrights asserted in connection with any
item mentioned in this standard. Users of this standard
are expressly advised that determination of any such
patent rights or copyrights, and the risk of infringement
of such rights, are entirely their own responsibility.
Copyright by SEMI® (Semiconductor Equipment and Materials
International), 3081 Zanker Road, San Jose, CA 95134. Reproduction o
f
the contents in whole or in part is forbidden without express written
consent of SEMI.

SEMI E84-0305 © SEMI 1999, 2005 1
SEMI E84-0305
SPECIFICATION FOR ENHANCED CARRIER HANDOFF PARALLEL I/O
INTERFACE
This specification was technically approved by the Global Physical Interfaces & Carriers Committee and is
the direct responsibility of the Japanese Physical Interfaces & Carriers Committee. Current edition approved
by the Japanese Regional Standards Committee on November 24, 2004. Initially available at www.semi.org
January 2005; to be published March 2005. Originally published June 1999; last published March 2004.
1 Purpose
1.1 Due to the migration to large wafer sizes, future semiconductor factories will use extensive automated material
handling systems (AMHS) to transfer wafer carriers, including FOUPs and open cassettes, of increasing weight. The
parallel input/output (PI/O) control signals between the production equipment and the AMHS must be better defined
for more reliable and efficient carrier handoffs (load/unload) at production equipment load ports.
1.2 The purpose of this specification is to enhance the capabilities of the parallel I/O interface defined in SEMI E23
in order to support improvements in the reliability and efficiency of carrier transfer. The enhanced capabilities
include continuous handoff, simultaneous handoff, and the capabilities of error detection on the interface.
NOTE 1: The specifications in this document shall be considered independent from the specifications in SEMI E23; therefore,
use of this specification does not require SEMI E23.
2 Scope
2.1 The scope of this specification is limited to communications associated with the material handoff operations
between the active equipment (for example, AMHS equipment including AGV, RGV and OHT) and the passive
equipment (for example, production equipment including process and metrology equipment; stockers, etc). This
scope also extends to interbay AMHS active equipment (i.e., OHS and stockers equipped with transfer devices) and
passive equipment (i.e., OHS and stockers not equipped with transfer devices). This specification defines the
enhanced parallel I/O interface signals used to handoff carriers between the production equipment and the AMHS.
Figures 1 and 2 show examples of types of AMHS equipment.
2.2 This enhanced carrier handoff parallel I/O interface specification includes:
Signal definition including load port assignment signals (¶6.1),
Carrier handoff sequence definitions and time diagrams (¶6.2),
Error indication, detection, and recovery (¶¶6.3 and 6.4),
Connector type, signal, and pin assignment (¶6.4), and
Interface sensor unit size to be located at load port defined by SEMI E15.1 (applicable for systems designed to
handle 300 mm wafer carriers).
2.3 The enhanced carrier handoff parallel I/O interface controls the handoff of a carrier to and from the passive
equipment by the active equipment. This parallel I/O interface only controls the automated handoff operation of the
carrier. The handoff is the operation in which a carrier is transferred from one piece of equipment to another. Both
the active and passive equipment manage this operation. The factory level controller (i.e., host) does not manage the
handoff operation. Figure 3 shows applications for the parallel I/O interface specified in this document.
NOTICE: This standard does not purport to address safety issues, if any, associated with its use. It is the
responsibility of the users of this standard to establish appropriate safety and health practices and determine the
applicability of regulatory or other limitations prior to use.
3 Limitations
3.1 Data for the material that is transferred (handed off) is managed through the equipment’s factory interface.
Material management by the factory level controller is outside the scope of this document.